How to Make a 5×5 Risk Matrix
A risk matrix shows every risk in your project on one grid: how likely it is and how bad it would be. Done well, it tells the team where to spend its attention. This guide walks through the five steps, the scoring scale most teams use, and three worked examples you can open and edit.
Project management · 2026-11-28 · 7 min read
Step 1: list the risks
Write each risk as an event with a consequence: "Key developer leaves mid-project", not "staffing". Get the team in a room for 20 minutes; people closest to the work see risks the plan misses. Ten to fifteen risks is typical for a project.
Step 2: score likelihood and impact
| Score | Likelihood | Impact |
|---|---|---|
| 1 | Rare | Minor |
| 2 | Unlikely | Moderate |
| 3 | Possible | Significant |
| 4 | Likely | Major |
| 5 | Almost certain | Severe |
Tip: Agree what the impact levels mean for your project before scoring, for example "Major = more than 4 weeks late or $50k over budget". Otherwise everyone scores by gut feel.
Step 3: calculate the score and level
Multiply likelihood by impact for a score from 1 to 25, then rate it:
| Score | Level | What to do |
|---|---|---|
| 15–25 | Critical | Act now; report to the sponsor |
| 10–14 | High | Mitigation plan with an owner and date |
| 5–9 | Medium | Monitor; plan if it grows |
| 1–4 | Low | Accept and review occasionally |
Step 4: add a mitigation and an owner
For every high and critical risk, write what will reduce the likelihood or the impact, and who owns it. A risk with no owner is a risk nobody is managing.
Step 5: review it regularly
Scores change as the project moves. Review the matrix at each steering meeting, close risks that have passed and add new ones.
Example: CRM migration
The highest risks are data lost in the import and the sales team sticking with spreadsheets. Both have clear mitigations: a dry-run import, and champions who retire the old sheets on go-live.
Example: Each risk is a numbered dot on the heat map, with the register beside it.
Example: cybersecurity assessment
Phishing is the most likely risk; ransomware and an unpatched VPN have the worst impact. MFA, tested offline backups and a 72-hour patch rule cover most of the red area.
Example: A cybersecurity risk matrix for a small company.
Example: construction project
Example: Permits, prices and site safety on one grid.
Common mistakes
- Vague risks. "Budget" is a topic, not a risk. "Steel prices rise 20%" is a risk.
- Everything is high. If most risks are red, the impact scale is not calibrated.
- Mitigations that are wishes. "Be careful" is not a mitigation. "Load test at 5× traffic" is.
- Built once, never reviewed. A risk matrix from the kickoff is out of date by week three.
Try: a risk matrix for your project →
Frequently asked questions
What is a 5×5 risk matrix?
A grid with likelihood on one axis and impact on the other, each scored 1 to 5. Each risk sits in a cell, and the cells are coloured from green (low) to red (critical).
How do you calculate a risk score?
Likelihood × impact. A risk that is likely (4) with major impact (4) scores 16, which is critical.
What is the difference between a risk matrix and a risk register?
The matrix is the picture; the register is the list with score, mitigation and owner. The templates here include both.
Are these risk matrix templates free?
Yes. Open any example, edit the risks and export it to PNG, PDF or PowerPoint. Having the AI draft risks needs AI Flowchart Pro or the $2.99 7-day pass.